0640, Mon, 082514. Rocklin, CA.

I got the framing ready then went for the existing wall, tearing it apart. Trim came off the window, nails out of the frame, sheet rock out, insulation out, electrical out, cut through the siding, then left it at that point. I don't want to leave a gaping hole overnight. So, in my sleep, while finishing the job, I realized I needed electricity in the floor for the pellet stove. The floor is to be covered before the walls go up making it impossible to do the electrical afterwards. Today I should be able to work that out and do the kit installation tomorrow probably instead of today.
Princess's parents came back and oh was she excited to see them. Now we miss the happy little face following us around to see what we are up to…..more later..