0539, Tue, 090324.  Rocklin, CA.


I was able to get the grout done on the last tile under the tub, while the tub is up on blocks to make room to work.  Then I moved on to setting the toilet.  I needed to drill six holes into the concrete floor to mount the toilet.  Eric let me borrow his roto hammer and I picked up some bits at the store.  After some time of drilling I think the holes are ready.  I set the little plastic things in the holes so it all looks pretty good so far…..more later..