0539, Tue, 090324. Rocklin, CA.
I was able to get the grout done on the last tile under the tub, while the tub is up on blocks to make room to work. Then I moved on to setting the toilet. I needed to drill six holes into the concrete floor to mount the toilet. Eric let me borrow his roto hammer and I picked up some bits at the store. After some time of drilling I think the holes are ready. I set the little plastic things in the holes so it all looks pretty good so far…..more later..
No comments:
Post a Comment